Tiered grey block retaining walls with planted terraces holding a hillside section above a concrete driveway in Christchurch
Concrete and Block Retaining Walls

Concrete Crib Retaining Walls in Christchurch

Top Retaining Walls Christchurch builds concrete crib retaining walls in Christchurch for banks that suit a gravity solution. Crib walls use interlocking precast concrete units laid in alternating tiers and filled with granular drainage material, and the weight of that fill is what holds the ground back.

  • Precast concrete headers and stretchers laid in tiers
  • Holds ground back by mass, not by deep posts
  • Built to a backward batter of about one in four

Get your free quote

Step 1 of 4

What are you building?

Takes about 30 seconds. Pick the closest one.

How tall is the wall?

Measure the ground you need held back, not the fence above it.

What sits above the wall?

This decides whether you need a building consent.

Almost done. Where do we send it?

We reply the same working day.

No obligation. Prefer to talk? Call [PHONE].

  • Drainage on every wall300mm of metal, a drain coil and geotextile. Never an optional extra.
  • H5 poles as standardThe right treatment for timber that lives in wet ground.
  • Consents handledChristchurch City, Selwyn and Waimakariri, start to finish.
  • Itemised quotesYou see what the drainage and the spoil actually cost.

How a concrete crib wall is put together

The first stretcher course goes on a concrete foundation or a well compacted base, set to establish the batter. From there the headers and stretchers alternate up the wall, forming open cells, and we backfill each layer with granular drainage material as the wall rises.

The finished wall leans back into the bank at around one in four. That lean, plus the weight of the fill, is the whole structural idea. There are no deep posts and no reinforcing steel running into the soil behind.

Concrete Crib Retaining Walls at a glance
UnitsPrecast concrete headers and stretchers
BatterAbout one in four backward lean
BaseConcrete foundation or compacted granular base
FillGranular drainage material placed in layers
Front cellsSoil filled and planted where you want a green face
Best forWide banks, variable ground, terraced solutions
Concrete block retaining wall built in Christchurch
Concrete block retaining wall built in Christchurch.

Why crib walls suit some Christchurch sites better than posts

On a site where the ground below is variable, or where machine access makes deep post holes difficult, a crib wall spreads its load over a wide base instead of relying on individual footings. Terraced crib walls also let you handle a tall bank as several short walls.

MBIE guidance uses exactly that example. Three 1.2m crib walls with enough horizontal separation that no wall loads the one below can avoid consent entirely, where one 3.6m wall could not.

Living face and long term look

Fill the front cells with topsoil and plant them, and within two or three seasons the concrete largely disappears. Trailing and creeping species work best. This is a common approach on rural boundaries and larger sections around Yaldhurst, West Melton and Tai Tapu.

Precast units also age well. There is no timber to rot and no coating to peel.

Every wall we build gets drainage. At least 300mm of clean free draining metal, a perforated coil at the base running to a real outlet, and geotextile over the top so silt cannot block it. It is not an optional line on our quotes.

Common questions

Questions about concrete crib walls

Are concrete crib walls still used?

Yes, particularly on larger sites and rural boundaries. They spread load over a wide base and give you a plantable face, which suits banks where a hard wall face would look out of place.

Can I terrace crib walls to avoid consent?

Sometimes. Each wall has to retain 1.5m or less and the horizontal separation has to be enough that no wall imposes a surcharge on the one below. We work that out on site and tell you honestly whether the geometry allows it.

What goes inside the cells?

Granular drainage material, not site spoil. The fill is structural. Filling cribs with clay or topsoil at the back is how these walls fail.

What people say

Reviews from Christchurch homeowners

★★★★★

Our old wall was rotten right through and leaning into the neighbour's place. They pulled the lot out, put proper drainage behind the new one and had it finished in three days. Swept the site clean every afternoon before they left too. Tidiest crew we have ever had here by a long way.

MMikeRiccarton
★★★★★

They sorted the consent, which was the bit I was dreading. Dealt with the council so I never had to, and kept me in the loop the whole way through. The driveway sits right above it and has not shifted a millimetre.

TTonyRolleston
★★★★★

Steep section, shocking access, and they still made it look easy. They suggested two smaller walls instead of one big one, which saved us thousands in engineering fees. The terrace in between is now my favourite part of the whole garden.

RRachelCashmere

Ready for a price on this?

Call [PHONE] or answer three quick questions. The site visit and the written quote cost you nothing.