Timber Pole Retaining Walls
We dig the post holes about 450mm across and take the depth down to roughly the same measurement as the finished wall height. A 1.2m wall gets a 1.2m hole. Poles go in at 1.2m centres, we brace them.
Read more
Top Retaining Walls Christchurch builds timber retaining walls across Christchurch, from a 600mm garden edge in Papanui to a stepped 1.4m terrace on a Cashmere slope. Timber suits most flat and gently sloping Canterbury sections, it goes up fast, and it costs less per metre than any other wall type.
The parts that matter on a timber wall are not the parts you see. Anyone can nail rails to a post. The wall lasts because the poles carry an H5 treatment, because the footing goes deep enough, and because there is 300mm of clean metal and a drain coil behind the face taking water away.
Get those three right and a properly drained H5 wall commonly runs 25 to 40 years. Skip the drainage and the same timber can rot out in 10 to 15, because the posts sit in wet ground the whole time and the soil behind stays heavy.

We dig the post holes about 450mm across and take the depth down to roughly the same measurement as the finished wall height. A 1.2m wall gets a 1.2m hole. Poles go in at 1.2m centres, we brace them.
Read more
New Zealand grades treated timber by where it is allowed to sit. H4 covers timber in contact with the ground in normal conditions, like a fence post. H5 covers timber in ground contact where it stays wet,.
Read more
We set H5 posts at 1.2m to 1.5m centres, then drop heavy H4 sleepers down between or behind them. The sleepers stack rather than fix individually, so the wall builds up fast, and the face stays perfectly.
Read more
Macrocarpa heartwood resists decay reasonably well without any chemical treatment. It is not as durable as H5 treated pine in wet ground, and it will not last as long, so we normally build the wall as.
Read more
Crib walls use H5 treated headers and stretchers laid in alternating tiers, a bit like a log cabin with open cells. We set the first stretcher course on a concrete foundation or a well compacted base to.
Read more
Sleepers give you the cleanest lines and suit a modern garden. Pole and rail costs least per metre and suits longer runs. Keystone block gives you curves, because segmental blocks step around a radius in.
Read more
Nearly every failed wall we get called to in Christchurch failed the same way. Water sat behind it, the soil got heavy, and the wall leaned out a little more each winter. So we build the drainage first and the face second.