Concrete and Block Retaining Walls

Poured Concrete Retaining Walls in Christchurch

Top Retaining Walls Christchurch builds poured reinforced concrete retaining walls in Christchurch for the jobs where nothing else will do. A poured wall is boxed up on site, filled with steel, and poured as one continuous structure. There are no joints for water to find and no units that can move independently.

  • Boxed and poured in place as one continuous structure
  • Takes buildings, driveways and steep fill above
  • Always engineer designed and consented

Get your free quote

Step 1 of 4

What are you building?

Takes about 30 seconds. Pick the closest one.

How tall is the wall?

Measure the ground you need held back, not the fence above it.

What sits above the wall?

This decides whether you need a building consent.

Almost done. Where do we send it?

We reply the same working day.

No obligation. Prefer to talk? Call [PHONE].

  • Drainage on every wall300mm of metal, a drain coil and geotextile. Never an optional extra.
  • H5 poles as standardThe right treatment for timber that lives in wet ground.
  • Consents handledChristchurch City, Selwyn and Waimakariri, start to finish.
  • Itemised quotesYou see what the drainage and the spoil actually cost.

Where a poured wall is the right answer

Poured concrete goes in when a building sits above the wall, when a driveway runs right along the top, or when the wall is tall enough that an engineer wants a single monolithic structure rather than stacked units. It is also the usual answer for basement and garage walls that double as retaining.

Every poured wall we build is engineer designed and consented. There is no version of this job that sits inside the Schedule 1 exemption.

Poured Concrete Retaining Walls at a glance
StructureSteel reinforced concrete poured in place
DesignChartered professional engineer, always
ConsentBuilding consent required, always
WaterproofingApplied to the retained face where drawings call for it
BackfillFree draining metal placed in compacted lifts
Best forBuildings, driveways and tall walls
TimelineLongest of any wall type, driven by curing and inspections
Concrete block retaining wall built in Christchurch
Concrete block retaining wall built in Christchurch.

What the build actually involves

We excavate and pour a reinforced footing, then fix the steel cage for the wall itself. Boxing goes up both faces, gets braced hard, and the wall pours in one go. Once the concrete has cured we strip the boxing, apply waterproofing where the drawings call for it, then build the drainage layer and backfill in compacted lifts.

It takes longer than any other wall type and it costs more. What you get is the strongest option available and a wall that will outlast the house.

Poured walls on Christchurch ground

The footing design changes a lot across the city. On the deep gravels through Hornby, Islington and Templeton the bearing is good and footings stay simple. On the eastern side, where loose sands and silts sit under a shallow water table, the geotechnical work drives the design and the footing gets more involved.

On Port Hills slopes the loess adds its own problem. Dry loess stands up in near vertical faces and looks solid, then loses strength when it gets wet. Engineers design for that, and it is one reason poured walls on the hill often come with quite specific drainage requirements.

Every wall we build gets drainage. At least 300mm of clean free draining metal, a perforated coil at the base running to a real outlet, and geotextile over the top so silt cannot block it. It is not an optional line on our quotes.

Common questions

Questions about poured concrete walls

Is a poured concrete wall worth the extra cost?

If a building or driveway sits above it, you rarely have a choice. For a garden bank you almost certainly do not need one, and block or timber will serve you better for the money.

Can a poured wall be curved?

Yes. The boxing can be formed to a curve or to an unusual angle, which is one advantage over stacked units on an awkward site.

How long before we can backfill against it?

The concrete needs time to reach strength first, and the engineer's drawings set that. Backfilling early is one of the fastest ways to damage a wall you just paid for.

What people say

Reviews from Christchurch homeowners

★★★★★

Our old wall was rotten right through and leaning into the neighbour's place. They pulled the lot out, put proper drainage behind the new one and had it finished in three days. Swept the site clean every afternoon before they left too. Tidiest crew we have ever had here by a long way.

MMikeRiccarton
★★★★★

They sorted the consent, which was the bit I was dreading. Dealt with the council so I never had to, and kept me in the loop the whole way through. The driveway sits right above it and has not shifted a millimetre.

TTonyRolleston
★★★★★

Steep section, shocking access, and they still made it look easy. They suggested two smaller walls instead of one big one, which saved us thousands in engineering fees. The terrace in between is now my favourite part of the whole garden.