Timber Retaining Walls
Timber is what most Christchurch sections end up with, and for good reason. A pole and rail wall goes up in a few days, costs less than block, and holds a 1.2m.
See more
Top Retaining Walls Christchurch builds retaining walls in Kaiapoi, about 20km north of Christchurch across the Waimakariri River. Kaiapoi took some of the worst liquefaction damage in the country during the September 2010 earthquake, and the ground conditions that caused it still shape how we build here.
The soils around the Kaiapoi River are loose sands and silts with a shallow water table, which is the combination that produces liquefaction under strong shaking. Large parts of the town were red zoned afterwards, and residential land along the river has been repurposed.
We favour flexible wall systems here. Gabion baskets deform slightly with ground settlement and keep holding, and timber pole walls tolerate small movements better than rigid unreinforced masonry. Where a rigid wall is genuinely needed, it needs proper engineering rather than a standard detail.
| Council for consents | Waimakariri District Council |
|---|---|
| Typical ground | Sandy silts, shallow water table |
| Walls we build most here | Gabion and timber pole |
| Consent threshold | 1.5m of retained ground, or any surcharge above the wall |
| Drainage | 300mm metal, perforated coil, geotextile, on every wall |
| Site visit | Free, with a written quote to follow |

With groundwater close to the surface and very little fall available, getting a drain coil to discharge properly is the hard part of a Kaiapoi wall. We plan the run and the outlet before anything is dug, and connect to stormwater where discharging to daylight will not work.
A coil with nowhere to go is worse than none, because it collects water and holds it right where you least want it.
Kaiapoi sits in the Waimakariri District, so building consents go to Waimakariri District Council rather than Christchurch City. The council must process a complete application within 20 working days of receiving it, and applications that arrive incomplete are the ones that drag.
We lodge Waimakariri applications regularly, so the paperwork side is routine for us.
Not sure whether your wall needs a consent? Send us a photo and a rough height. Under 1.5m of retained ground with nothing loading it from above is exempt. A driveway, a building, a pool or fill sloping up behind it is a surcharge, and that changes the answer.
Yes. The design has to suit the ground, which usually means flexible wall types and careful attention to drainage discharge. It does not mean you cannot have a wall.
Waimakariri District Council, not Christchurch City. We lodge and manage those applications for you.

Timber is what most Christchurch sections end up with, and for good reason. A pole and rail wall goes up in a few days, costs less than block, and holds a 1.2m.
See more
Concrete lasts longer than timber and carries far more load, which is why it goes in wherever a driveway, a shed or a neighbour's lawn sits above the wall. We build.
See more
Once a wall passes 1.5m, or once a driveway or building sits above it, the job changes. You need a chartered engineer, a building consent and inspections. We manage.
See more
Stone is the choice when the wall has to look like it belongs. Canterbury gives us plenty to work with, including Halswell basalt, Port Hills volcanic stone, Timaru.
See moreAnswer three quick questions or call [PHONE] and we will book a free site visit.