Concrete Block Retaining Walls
We excavate down to firm bearing and pour a reinforced concrete footing with starter bars standing up out of it. The blocks thread down over those bars course by course, we tie in horizontal steel as the.
Read more
Top Retaining Walls Christchurch builds concrete retaining walls across Christchurch. That covers Keystone and Firth segmental block, steel post and concrete sleeper systems, and poured reinforced concrete walls for the jobs that carry real load. Concrete costs more than timber up front and then stops costing you anything.
Concrete becomes the obvious answer when something heavy sits above the wall. A driveway, a garage slab, a pool or a neighbour's fill all put extra load on the back of the wall, and that load is exactly what timber struggles with over time.
The other reason people choose concrete in Christchurch is what happened in 2011. The MBIE review of wall performance after the Canterbury earthquakes found that engineered concrete block walls generally did well, and the propped or buttressed ones did better than pure cantilevers. That record matters on a Port Hills section.

We excavate down to firm bearing and pour a reinforced concrete footing with starter bars standing up out of it. The blocks thread down over those bars course by course, we tie in horizontal steel as the.
Read more
Each Compac III block drops onto pins set in the course below, and those pins hold the setback automatically. The wall leans back about 8 degrees as it rises, which puts the mass of the blocks working.
Read more
The posts are hot dip galvanised steel with a channel on each side. We set them in concrete footings, then slide reinforced concrete panels down the channels one at a time. The soil pushes the panel into.
Read more
Poured concrete goes in when a building sits above the wall, when a driveway runs right along the top, or when the wall is tall enough that an engineer wants a single monolithic structure rather than.
Read more
The first stretcher course goes on a concrete foundation or a well compacted base, set to establish the batter. From there the headers and stretchers alternate up the wall, forming open cells, and we.
Read more
Nearly every failed wall we get called to in Christchurch failed the same way. Water sat behind it, the soil got heavy, and the wall leaned out a little more each winter. So we build the drainage first and the face second.
We cover the whole city plus the Selwyn and Waimakariri towns within a sensible drive.
We will come out, measure it and tell you straight. The site visit and the written quote are both free.